JOSH LAWSON
Key Photo

General Scope of Work
- Mobilization through closeout
- Ground-up, TI and site work
- Occupied-store remodels, day and night
- Subcontractor coordination and buyout
- RFIs, change orders, owner schedule
- Punch lists, daily reports, compliance
General Notes
| Scope | As superintendent | What it means for a PM role |
|---|---|---|
| Owner schedule | Built and ran the whole-job schedule and a rolling three-week lookahead | Schedule that matches the field, not a guess |
| Buyout and subs | Buyout support, coordination of 15 to 80 subs per job | Knows what each trade needs to hit its dates |
| RFIs and change orders | Wrote and tracked RFIs and change orders, engineer-approved field fixes | Catches cost and scope problems early |
| Budget | Restaurant projects from $500K to $2.2M delivered on time and on budget | Field-checked numbers |
| Safety and compliance | Lockout/tagout, inspections, toolbox talks, worker verification | Zero recordables since 2020 |
| Owner communication | Daily reports, weekly summaries, punch walks with the owner | No surprises |
| Closeout | Punch lists with photos and plan locations, turnover | Jobs that close clean |
- Led remodels of four open, operating Walmart Supercenters in Pennsylvania (Tamaqua, Lewisburg early phase, Selinsgrove, Everett) while the stores kept trading. Selinsgrove turned over on time with no issues.
- Led day shift and coordinated with the night superintendent across 15+ subcontractors.
- Owned the safety and compliance program: lockout/tagout, weekly inspections, toolbox talks, manpower reports and worker verification.
- Managed RFIs, change orders, buyout, punch lists, daily journals and the owner's schedule.
- Built JobsiteHQ, a live project website for the client, store management and trades: area status on the plans, photo punch list with map pins, RFIs, change orders and compliance reports.
- Ran commercial restaurant projects from $500K to $2.2M and 2,000 to 5,000 SF, including Chipotle and Chick-fil-A: ground-up builds, remodels and reinvestments, many with major site work.
- Traveled to jobs across 10 states, running them independently from mobilization through closeout.
- Coordinated 30 to 80 subcontractors and vendors per project and delivered on time and on budget.
- Solved field problems like material shortages and structural conflicts with engineer-approved fixes that held the schedule.
- Led electrical installation, service upgrades and maintenance on commercial builds, often the most complex or critical jobs.
- Primary contact for urgent electrical calls, including after-hours, weekend and travel response.
- Trained and mentored junior electricians on code, safety and quality. Promoted to superintendent.
Full remodel of an open store: 64 scoped areas including a modular pharmacy, customer and associate restrooms, front end and self-checkout, online pickup canopy, site concrete and parking lot. Grand opening October 30, 2026.
Full remodel of an open store with day and night crews while the store kept selling, plus a 3,000 to 4,000 SF building expansion for the online grocery pickup area: footings, groundwork, grading, stormwater, MEP reconfiguration, new panels, store shutdowns, crane lifts, masonry and third-party inspections. Also new refrigeration equipment, RCUs and RTUs, roof and parapet membrane, structural steel, energy management system and site lighting.
Ground-up restaurant build from bare site to opening day, including underground utilities, a retaining wall and a detention pond.



Remodels and reinvestments from $500K to $2.2M, run solo from mobilization through closeout, many with major site work.




Restaurant build from mobilization through turnover.

Sheet Notes
Keynotes
| No. | Dates | Project | Location | Type | Keynotes |
|---|---|---|---|---|---|
| 1 | Jul to Oct 2026 | Walmart Supercenter | Everett, PA | Full remodel, open store | K1K2 |
| 2 | Feb to Jul 2026 | Walmart Supercenter | Selinsgrove, PA | Full remodel, open store, plus 3,000 to 4,000 SF OGP expansion | K1K2 |
| 3 | Jan to Feb 2026 | Walmart Supercenter | Lewisburg, PA | Remodel, open store, plus OGP expansion (early phase) | K1 |
| 4 | Sept 2025 to Jan 2026 | Walmart Supercenter | Tamaqua, PA | Full remodel, open store, plus 3,000 to 4,000 SF OGP expansion | K1K2 |
| 5 | Mar to Aug 2025 | Chipotle | Wentzville, MO | Ground-up build | K3K4 |
| 6 | Jan to Mar 2025 | Chick-fil-A | Summerville, SC | Remodel | K4K5 |
| 7 | Aug 2024 to Jan 2025 | Chipotle | Bowling Green, KY | Restaurant | K4 |
| 8 | Mar to Aug 2024 | Chick-fil-A | Orlando, FL | Remodel | K4 |
| 9 | Jan to Mar 2024 | Chick-fil-A | Seekonk, MA | Remodel | K4 |
| 10 | Dec 2023 to Jan 2024 | Chick-fil-A | Vestavia Hills, AL | Remodel | K4 |
| 11 | Sept to Dec 2023 | Chick-fil-A | Forest Hill, MD | Remodel | K4 |
| 12 | Jun to Sept 2023 | Chick-fil-A | Clermont, FL | Remodel | K4 |
| 13 | Feb to Jun 2023 | Chick-fil-A | Marietta, GA | Remodel | K4 |
| 14 | Dec 2022 to Feb 2023 | Chick-fil-A | Mount Dora, FL | Remodel | K4 |
| 15 | Nov to Dec 2022 | Chick-fil-A | Virginia Beach, VA | Remodel | K4 |
| 16 | Sept to Nov 2022 | Chick-fil-A | Avon, IN | Remodel | K4 |
| 17 | Jul to Sept 2022 | Chick-fil-A | Bloomington, IN | Remodel | K4 |
| 18 | Jun to Jul 2022 | Chick-fil-A | Athens, GA | Remodel | K4K5 |
| 19 | Feb to Jun 2022 | Chick-fil-A | Louisville, KY | Remodel | K4 |
| 20 | Aug 2021 to Feb 2022 | Chipotle | Decatur (Stone Mountain area), GA | Ground-up build | K3K4K5 |
| 21 | Apr to Aug 2021 | Chick-fil-A | Pell City, AL | Remodel | K4 |
| 22 | Nov 2020 to Apr 2021 | Chick-fil-A | Birmingham, AL | Remodel | K4 |
| 23 | Aug to Nov 2020 | Chipotle | Stockbridge (Eagle's Landing), GA | Build-out in a strip center. First project as superintendent | K4 |
JobsiteHQ
Lookahead template
Punch lists that close
Paperwork done by quitting time
No surprises for the owner
- Lockout/tagout program and panel logs on every job
- Weekly safety inspections and toolbox talks
- Subcontractor compliance and worker verification tracked daily
- Occupied-store phasing that keeps customers and associates clear of the work
Credentials
- OSHA 30-Hour Construction
- CADE certified (Walmart)
- Journeyman Electrician Apprenticeship, NEFBA, 2004 to 2007
- Journeyman Electrician, Duval County, FL (inactive)
- Electrical Engineering coursework, FCCJ
- First Aid/CPR/AED
- Forklift and rough terrain operator
- CMiC, Procore, Wrike, PlanGrid, HoloBuilder, Lucernex, Pulse
- Microsoft 365 and advanced Excel (custom scheduling templates)
Foundation
Completed K through 12. Graduated high school with a 3.8 GPA.
2007
Journeyman Electrician
Journeyman Electrician Apprenticeship, Northeast Florida Builders Association (NEFBA), Jacksonville, 2004 to 2007. Tested out of the first year.
Revised
Design Change 1
Original design: Electrical Engineering degree, night classes at FCCJ while working full time (1.5 years completed).
Revised to: Start a family and raise two beautiful children. Night classes paused. Master the trade instead: 17 years as an electrician, often the lead on the most complex jobs.
2020
Change Order 1: Superintendent
Not in the original design. Promoted from electrician to superintendent in 2020 and delivered 23 major projects in 11 states with zero recordable injuries.
TBD
Next Level: Future Addition
Project manager role. Scope and owner to be determined. RFI-001 issued and open, see sheet A1.
Revision Schedule
General Notes
No matter what I build, nothing beats the views on the way to the next job.

